{"id":10364,"date":"2026-11-17T22:07:47","date_gmt":"2026-11-17T19:07:47","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=10364"},"modified":"2026-11-18T20:57:19","modified_gmt":"2026-11-18T17:57:19","slug":"apc-e3mups60khbs-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3mups60khbs-three-phase-ups\/","title":{"rendered":"APC E3MUPS60KHBS 60 kVA Three-Phase UPS for VRLA Batteries"},"content":{"rendered":"<p>The APC E3MUPS60KHBS delivers the full 60 kVA \/ 60 kW rating in a three-phase UPS designed for a 240 V VRLA battery set, supplied without the batteries themselves. That is its place among the three 60 kVA models: the battery purchase stays in the buyer&#8217;s hands while the battery technology and voltage are fixed in advance. For a facilities team that already holds a framework agreement with a battery supplier, or that wants to choose the battery brand and delivery date independently of the UPS, this model avoids paying for stored energy it does not need. It operates at 400 V with a 3:3 phase configuration, three-phase input and three-phase output, and its apparent and real power ratings match, so the full 60 kW can be planned as usable load. The result is a balanced middle option: the same rating, a defined battery specification, and the battery cost on a separate line the buyer controls.<\/p>\n<h2>How the APC E3MUPS60KHBS works once installed<\/h2>\n<p>Installed between the three-phase supply and the critical board, the UPS feeds the load from mains or generator in normal operation and transfers it to the VRLA batteries when the supply fails, holding it until power returns or the generator takes over. Because the batteries are ordered separately, backup time is decided when the battery set is specified, not when the UPS is bought. That helps when the runtime target is still being agreed with operations: the UPS can be ordered against the known load within 60 kW while the battery purchase runs in parallel.<\/p>\n<p>The batteries must match the 240 V battery voltage and the VRLA type the unit is designed for. Do not schedule first start-up until the batteries are on site, since without them the UPS gives no cover during an outage.<\/p>\n<h2>Typical Saudi applications<\/h2>\n<p>The usual buyer is a government entity or large company that buys batteries through central contracts, or a contractor delivering several sites who wants one battery supplier across all of them. The unit suits data rooms in regional branch offices, CCTV and access-control head-ends in malls and hotels, control rooms in water and utility facilities, and hospital IT rooms where battery purchases go through a separate approval path.<\/p>\n<h2>APC E3MUPS60KHBS against its siblings<\/h2>\n<p>The E3MUPS60KHB2S shares the 60 kVA \/ 60 kW rating but ships with its batteries, which reduces procurement to one order. The E3MUPS60KHS shares the same rating but works with an external battery system, which suits a site planning a dedicated battery cabinet. Choose the E3MUPS60KHBS when you want the VRLA battery arrangement without buying the batteries on the same order. For heavier loads, the E3MUPS80KHS is rated at 80 kVA \/ 80 kW.<\/p>\n<h2>Deployment notes<\/h2>\n<p>Prepare a 400 V three-phase feed and a three-phase output to the protected board. Plan an air-conditioned room with space for the UPS and its batteries together, since VRLA batteries lose service life in heat. Fit the supplied dust filter and check it regularly on dusty sites, and follow the installation guide for cabling and the start-up sequence.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 60 kVA \/ 60 kW three-phase UPS from APC designed for 240 V VRLA batteries and supplied without them, for 400 V 3:3 installations.<\/p>\n","protected":false},"featured_media":21128,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-10364","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=10364"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10364\/revisions"}],"predecessor-version":[{"id":10365,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10364\/revisions\/10365"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21128"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=10364"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=10364"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=10364"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=10364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}