{"id":10536,"date":"2026-11-17T21:33:46","date_gmt":"2026-11-17T18:33:46","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=10536"},"modified":"2026-11-18T20:57:20","modified_gmt":"2026-11-18T17:57:20","slug":"apc-e3sups10khb1-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3sups10khb1-three-phase-ups\/","title":{"rendered":"APC E3SUPS10KHB1 Three-Phase UPS, 10 kVA, Internal VRLA"},"content":{"rendered":"<p>APC E3SUPS10KHB1 is a 10 kVA three-phase UPS with a 10 kW output, built around one internal VRLA battery string with a capacity of 7Ah and a battery string voltage of 240 V. That makes it the 10 kVA choice for sites that want the batteries to live inside the UPS itself rather than in a separate cabinet that needs its own floor space and cabling. The design also leaves room to grow: the unit accepts a maximum of 3 battery strings, so a site that later needs longer autonomy can add strings up to that limit instead of replacing the UPS. For a facilities or security manager with a modest critical load and a runtime requirement that is not yet settled, this combination of an internal battery and expansion headroom is the main reason to pick this model over its siblings.<\/p>\n<h2>How the APC E3SUPS10KHB1 battery arrangement works<\/h2>\n<p>A battery string is a set of batteries connected in series to reach the DC voltage the UPS runs on; on this model each string works at 240 V. When the mains fails, the internal string supplies the load, and runtime depends on how much of the 10 kW output the connected equipment actually draws: a lightly loaded unit runs longer on the same 7Ah string than a fully loaded one. Adding strings, up to the maximum of 3, increases the stored energy available to the load and therefore the minutes of backup. Start on the internal string, measure the real load, and decide on extra strings with that figure in hand rather than guessing at the outset.<\/p>\n<h2>Saudi applications for the APC E3SUPS10KHB1<\/h2>\n<p>The model suits three-phase sites with a small critical load that cannot afford to stop in the first minutes of an outage: the network and communications equipment of a bank branch, the communications room of a school or clinic, or the CCTV recording rack and access control of a warehouse in Riyadh, Dammam or Jeddah. On construction project site offices, the internal battery removes the need for a separate battery cabinet that would have to be housed and protected. It also keeps the installation compact in electrical rooms where switchgear already takes most of the floor. Remote facilities, where every technician visit is costly, benefit from starting with a known battery configuration and adding strings during a scheduled maintenance visit.<\/p>\n<h2>Choosing between the 10 kVA models<\/h2>\n<p>The E3SUPS10KHB shares the 10 kVA \/ 10 kW rating and also uses VRLA batteries, and the E3SUPS10KHB2 is listed at 10 kW \/ 10 kVA as well, so compare the battery arrangement of each model with your runtime plan before ordering. Choose the E3SUPS10KHB1 when you want a single internal string as the starting point with the option to expand. If the load will outgrow this class, the E3SUPS15KHB at 15 kVA, the E3SUPS20KHB1 at 20 kVA and the E3SUPS30KHB at 30 kW \/ 30 kVA are the next ratings. Large critical boards move to the E3MUPS range, such as the E3MUPS80KHS at 80 kVA \/ 80 kW, which works with an external battery system.<\/p>\n<h2>Deployment notes<\/h2>\n<p>Have the electrical contractor size the three-phase feeder, breaker and cabling for a 10 kVA unit. Any additional battery strings should match the 240 V string voltage and the VRLA type of the internal string, and must stay within the maximum of 3 strings. Because VRLA batteries lose service life in heat, place the UPS in an air-conditioned room rather than an unventilated electrical cupboard; a Saudi summer shortens battery life quickly. The box includes a dust filter and the installation guide: use the filter in plant rooms exposed to dust, and follow the guide for connection and start-up. Keep a register of the connected equipment and check every addition against the 10 kW output before connecting it.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 10 kVA three-phase UPS from APC with a 10 kW output, one internal 7Ah VRLA battery string at 240 V and room for up to 3 battery strings.<\/p>\n","protected":false},"featured_media":21107,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-10536","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=10536"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10536\/revisions"}],"predecessor-version":[{"id":10537,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10536\/revisions\/10537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21107"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=10536"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=10536"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=10536"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=10536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}