{"id":10541,"date":"2026-11-17T21:33:44","date_gmt":"2026-11-17T18:33:44","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=10541"},"modified":"2026-11-18T20:56:13","modified_gmt":"2026-11-18T17:56:13","slug":"apc-e3sups20khb2-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3sups20khb2-three-phase-ups\/","title":{"rendered":"APC E3SUPS20KHB2 20 kVA Three-Phase UPS, 3 Battery Strings"},"content":{"rendered":"<p>The APC E3SUPS20KHB2 is the 20 kVA three-phase UPS for buyers who want the battery question settled at the point of purchase. It ships with 3 internal battery strings fitted, each of 7Ah, so it carries more stored energy from commissioning day than the E3SUPS20KHB1, which arrives with fewer strings. That puts it at the balanced point of the family from a different direction: the rating stays at 20 kVA, so you do not step up to a larger and costlier frame, while the battery side comes stocked for longer autonomy with no follow-up purchase and no second site visit. On sites where every minute of hold-up time counts, such as a control room waiting for a generator to start, a clinic&#8217;s information systems saving their records, or a branch closing out the day&#8217;s transactions, this is the configuration that puts the full protection in place from the start.<\/p>\n<h2>What three fitted strings mean for the APC E3SUPS20KHB2<\/h2>\n<p>The strings work in parallel. At a given load, more strings of the same capacity mean more energy to draw on, and therefore a longer hold-up time before the batteries are exhausted. What does not change is the ceiling on what the UPS can power: that stays at 20 kVA whatever the battery configuration. Size the load against the rating first, then use the fitted strings to judge whether the autonomy suits your generator start-up time or your orderly shutdown procedure.<\/p>\n<p>Because the strings are installed together, they also age together. When renewal is due, replace them as a matched set of 7Ah strings rather than one at a time, so that a single tired string does not drag down the rest.<\/p>\n<h2>Saudi sites that gain from longer autonomy<\/h2>\n<p>This configuration earns its keep where a technician is far away or an outage is expensive: the control room of a pumping station, a telecom shelter on an intercity highway, the security room of a hotel in Makkah or Madinah during peak seasons, the control room of a plant in Jubail, or a bank branch that needs to shut its systems down cleanly during a long interruption. On each of these sites, the extra minutes give the team time to act instead of facing an abrupt shutdown.<\/p>\n<h2>The E3SUPS20KHB2 against its siblings<\/h2>\n<p>The E3SUPS20KHB1 shares the 20 kVA rating but arrives with fewer strings and a free position for later expansion, which suits buyers who prefer to split the battery spend into two stages. The E3SUPS20KHB carries the same rating as well. For smaller loads, the E3SUPS15KHB2 is rated 15 kVA and the E3SUPS10KHB2 is rated 10 kW \/ 10 kVA. For larger ones, the E3SUPS30KHB2 steps up to 30 kW \/ 30 kVA. Choose the E3SUPS20KHB2 when 20 kVA covers your load and backup time is the priority.<\/p>\n<h2>Deployment notes<\/h2>\n<p>When preparing the installation position, include the weight of the fitted batteries in your floor-loading and handling calculations, and leave clear access to the battery compartment for future renewal. Provide a three-phase supply with protection specified by your electrical designer for a 20 kVA load, and have a qualified electrician carry out connection and commissioning following the supplied installation guide. Keep the supplied dust filter in place and clean it during routine maintenance.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 20 kVA APC three-phase UPS that ships with 3 internal 7Ah battery strings fitted, for longer backup time from commissioning day with no follow-up battery order.<\/p>\n","protected":false},"featured_media":21106,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-10541","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=10541"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10541\/revisions"}],"predecessor-version":[{"id":10542,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10541\/revisions\/10542"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21106"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=10541"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=10541"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=10541"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=10541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}