{"id":10546,"date":"2026-11-17T21:33:43","date_gmt":"2026-11-17T18:33:43","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=10546"},"modified":"2026-11-18T20:56:13","modified_gmt":"2026-11-18T17:56:13","slug":"apc-e3sups30kh-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3sups30kh-three-phase-ups\/","title":{"rendered":"APC E3SUPS30KH 30 kVA Three-Phase UPS, External Battery"},"content":{"rendered":"<p>The APC E3SUPS30KH is a 30 kW \/ 30 kVA three-phase UPS for 400V installations, and within the 30 kVA group of the APC three-phase family it is the model that separates the power electronics from the energy storage. It runs from an external lead-acid battery system rather than batteries fitted inside the frame, so backup time is not fixed by what fits in one cabinet: it is decided by the battery bank you pair with it. That makes it the balanced choice for a site that needs real 30 kW capacity today but expects its runtime requirement to change, or that prefers to keep batteries in a dedicated, separately cooled room away from the rest of the electrical equipment. Because the kW and kVA ratings are equal, the whole capacity is available as real power when you add up the load.<\/p>\n<h2>Planning runtime around the APC E3SUPS30KH<\/h2>\n<p>With an external battery system, runtime becomes a design decision rather than a fixed attribute of the unit. Start from the protected load in watts, decide how long the site must ride through an outage, typically until a standby generator starts and accepts the load, and size the external lead-acid bank to cover that window. Leave the selection of battery cabinets and the routing of DC cabling to the electrical designer on your project.<\/p>\n<p>The separation also changes maintenance. Batteries can sit in their own ventilated, air-conditioned space, away from the heat of the UPS itself, and a battery replacement becomes work on the battery bank without touching the UPS cabinet.<\/p>\n<h2>How it compares with the other 30 kVA models<\/h2>\n<p>The E3SUPS30KHB carries internal VRLA batteries, which makes it the simpler self-contained option when the required backup time is short and floor space is limited. The E3SUPS30K3IB2 also keeps its batteries inside the unit, as a fixed set of internal strings, and the E3SUPS30KHB2 is the remaining 30 kW \/ 30 kVA variant in the line. Choose the E3SUPS30KH when runtime flexibility matters more to you than having everything in one enclosure. Across the wider family, the E3SUPS20KHB is rated 20 kVA for lighter loads, while the E3SUPS80KHS reaches 80 kVA \/ 80 kW and the E3SUPS100KHS reaches 100 kVA \/ 100 kW for large facilities.<\/p>\n<h2>Saudi applications for an external-battery 30 kVA UPS<\/h2>\n<p>Sites that need long ride-through are the natural fit: a data room in a government building that must bridge an outage until the generator stabilises, the central security room of a residential compound running CCTV recording and perimeter protection, a network and telecom hub at an industrial facility in Jubail or Yanbu, and the front-office and reservation systems of a hotel. In each case the battery room can be planned around the runtime target, while the UPS itself remains a single cabinet in the electrical room.<\/p>\n<h2>Deployment notes<\/h2>\n<p>Confirm that the site supply is three-phase 400V before ordering, and have the electrical designer select input breakers, output protection and cable sizes for a 30 kW load. Because the batteries are external, plan their location, the DC cable route and battery-side protection at the same time as the UPS position, not after delivery. First commissioning should be carried out by a qualified electrician working from the supplied installation guide. Fit the supplied dust filter and clean it regularly, especially on dusty sites.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 30 kW \/ 30 kVA APC three-phase UPS for 400V supplies that runs from an external lead-acid battery system, so backup time is set by the battery bank you pair with it.<\/p>\n","protected":false},"featured_media":21105,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-10546","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=10546"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10546\/revisions"}],"predecessor-version":[{"id":10547,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/10546\/revisions\/10547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21105"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=10546"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=10546"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=10546"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=10546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}