{"id":12240,"date":"2026-11-17T21:32:42","date_gmt":"2026-11-17T18:32:42","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=12240"},"modified":"2026-11-18T20:56:12","modified_gmt":"2026-11-18T17:56:12","slug":"apc-e3sups10khb2-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3sups10khb2-three-phase-ups\/","title":{"rendered":"APC E3SUPS10KHB2 10 kVA Three-Phase UPS, Internal Batteries"},"content":{"rendered":"<p>APC E3SUPS10KHB2 is a three-phase UPS rated at 10 kW \/ 10 kVA, the smallest rating in the APC three-phase family, and it arrives with its batteries already inside the frame. Two internal 7Ah VRLA battery strings sit on a 240 V battery bus, and the cabinet leaves room to expand to three strings when the site needs longer support. Because the kW figure matches the kVA figure, the whole rating is available as real power, so load planning works directly in watts. For a facilities manager this means one cabinet that covers a small server room, a security control room or a network core without a separate battery cabinet on day one. Choose it when the protected load sits comfortably under 10 kW and the priority is a compact, self-contained installation rather than headroom for growth.<\/p>\n<h2>How the APC E3SUPS10KHB2 works in practice<\/h2>\n<p>Equal kW and kVA ratings simplify sizing. Add up the real power drawn by the equipment you intend to protect, such as servers, network switches, NVRs and access-control panels, and keep the total under 10 kW with a sensible margin for later additions. There is no lower watt ceiling hidden behind the kVA figure, so the number on the nameplate is the number you plan against.<\/p>\n<p>The internal battery strings decide how long the load rides through an outage. With the two fitted strings, the unit covers short interruptions and gives a standby generator time to start and take the load. Adding the third string raises stored energy within the same cabinet, which is the first lever to pull if your generator transfer is slow or you need more time for an orderly shutdown. VRLA batteries are sealed and need no topping up, but their life shortens with heat, so a cooled, ventilated UPS location pays back in battery service life.<\/p>\n<h2>Where it fits in Saudi facilities<\/h2>\n<p>A three-phase unit at this rating suits the rooms that keep a site running without drawing heavy power: the CCTV and access-control room of a residential compound or school, the IT closet of a clinic or branch office, the control-panel room of a small factory, or the network core of a retail outlet. In these settings a three-phase supply is usually already available at the distribution board, and the UPS connects to it directly. The dust filter shipped in the box matters in Saudi conditions, where fine dust reaches plant rooms and equipment closets; keeping the filter fitted and cleaning it on a schedule protects the internal components.<\/p>\n<h2>Choosing between the E3SUPS10KHB2 and its siblings<\/h2>\n<p>The E3SUPS10KHB and the E3SUPS10KHB1 sit in the same rating class. If your load is approaching the limit, the E3SUPS15KHB2 steps up to 15 kVA. The E3SUPS20KHB2 steps up again to 20 kVA. For larger rooms, the E3SUPS30KHB2 is rated 30 kW \/ 30 kVA. The E3SUPS40KHB2 is rated 40 kW \/ 40 kVA. Pick the E3SUPS10KHB2 when the load is known, stable and below 10 kW, and when you want the batteries delivered inside the unit rather than sourced separately.<\/p>\n<h2>Deployment notes<\/h2>\n<p>Plan the battery side before installation day. The 240 V battery bus and the 7Ah string size define what the third string must match, so order the expansion string to the same specification rather than mixing capacities. Leave service access to the battery compartment and the dust filter, and keep the installation guide with the site documentation so maintenance staff can follow the same procedure later. Size the upstream breaker and cabling for a 10 kVA three-phase load according to local electrical practice, and have a qualified electrician make the connection.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 10 kW \/ 10 kVA APC three-phase UPS that ships with two internal 7Ah VRLA battery strings on a 240 V battery bus, expandable to three strings inside the same cabinet.<\/p>\n","protected":false},"featured_media":21026,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-12240","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/12240","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=12240"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/12240\/revisions"}],"predecessor-version":[{"id":12241,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/12240\/revisions\/12241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21026"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=12240"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=12240"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=12240"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=12240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}