{"id":14534,"date":"2026-11-17T21:32:24","date_gmt":"2026-11-17T18:32:24","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=14534"},"modified":"2026-11-17T21:32:24","modified_gmt":"2026-11-17T18:32:24","slug":"apc-pdm3532iec-80-power-distribution-module","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-pdm3532iec-80-power-distribution-module\/","title":{"rendered":"APC PDM3532IEC-80 Power Distribution Module"},"content":{"rendered":"<p>APC PDM3532IEC-80 is the power distribution module to assess when the intended output connection is close to the distribution position. Its 80 cm output cable makes local routing the central selection question: the receiving equipment needs to sit within the planned cable path, with a practical approach to the connection. The electrical configuration combines a 400 V three-phase input, a 50 Hz frequency and a 32 A maximum line current. For a Saudi facilities manager arranging power connections within a technical area, this version belongs in a layout where proximity is established before ordering. Match the measured route and equipment interface to the module, then have the electrical team confirm the load and protection arrangement.<\/p>\n<h2>APC PDM3532IEC-80 for a nearby connection<\/h2>\n<p>The 80 cm output cable directs attention to the immediate installation area. Check where the cable leaves the distribution position, where it must turn and how it approaches the receiving equipment. Even nearby connection points can require a longer routed distance than their apparent separation suggests. Marking the intended positions before procurement helps establish whether this model suits the job. It also lets the contractor agree the local arrangement with the facilities team before other equipment occupies the surrounding space.<\/p>\n<h2>A defined outlet interface<\/h2>\n<p>This module has one IEC 309 32 A outlet. The receiving connection should be checked against that outlet as part of equipment selection, so the cable ends at the intended interface. Include the connection designation on the project schedule together with the complete model name. For a buyer handling several electrical accessories, that description is more useful than a general reference to a power module. It gives the installation team a specific connection to verify when the equipment reaches the site.<\/p>\n<h2>Electrical conditions for the circuit<\/h2>\n<p>The input requirement is 400 V three-phase at 50 Hz, and the maximum current draw is 32 A. A three-pole breaker rated at 32 A forms part of the module. Review these characteristics with the electrical engineer responsible for the upstream supply and the connected load. A nearby connection still needs the same attention to circuit design as a more distant one. Confirm the supply arrangement and protection coordination during the design review, then identify the assigned circuit in the installation documents.<\/p>\n<h2>Where the local layout is useful<\/h2>\n<p>Technical rooms in Saudi office buildings, communications areas in logistics facilities and infrastructure spaces within healthcare sites can evaluate this model where the planned connection is local. The key is a layout that supports its cable path and electrical requirements. For an operations manager, the immediate benefit of that planning is knowing exactly which equipment connection the module will serve. Define the service point before ordering, and agree its position with the contractor responsible for the room&#8217;s final equipment arrangement.<\/p>\n<h2>Choosing between family versions<\/h2>\n<p>Consider PDM3532IEC-680 and PDM3532IEC-740 when reviewing alternative routing arrangements, while keeping this model assigned to its own measured location. The 80 cm cable on this unit should determine whether it fits the local path. Do not allow the general family name to replace a location-specific selection in the purchasing schedule. Where a project includes several distribution positions, a room-by-room model allocation helps buyers maintain the intended design and helps installers place the correct unit at each connection point.<\/p>\n<h2>Access during installation and maintenance<\/h2>\n<p>Plan the nearby equipment arrangement so the output connection remains accessible after installation. Allow for the direction of the mating connector and the actual cable route when positioning equipment. The installation guide belongs in the contractor&#8217;s preparation and the facility&#8217;s maintenance records. After commissioning, keep a clear description of the served circuit and the connection location. If the receiving equipment is moved later, the operations team can return to that description and assess whether the original local arrangement still suits the revised layout.<\/p>\n<h2>Project identification and purchasing<\/h2>\n<p>The grey finish can form part of the equipment description used during delivery inspection. The module has CE and VDE certifications and a 1 Year warranty, which can be included in the relevant purchasing paperwork. When reviewing an offer, match the complete product reference and its electrical characteristics to the approved schedule. An offer for a related model should be assessed against the same route and circuit requirements before acceptance. This keeps the purchasing decision tied to the physical connection the installation was designed to provide.<\/p>\n<h2>Preparing a clear handover<\/h2>\n<p>At handover, show the facilities team where the module connects and how its output cable follows the local path. Keep the model reference with the circuit identification so later maintenance staff can relate the installed hardware to the drawings. That record is especially useful when adjacent equipment changes position. Reviewing the connection arrangement before a move helps the team preserve a serviceable installation and determine whether a different routing plan is needed.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Power distribution module with an 80 cm output cable for a nearby connection. Uses 400 V three-phase input with one IEC 309 32 A outlet and a 32 A three-pole breaker.<\/p>\n","protected":false},"featured_media":21003,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[851],"product_tag":[],"class_list":["post-14534","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-power-distribution-pdu","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/14534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=14534"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/14534\/revisions"}],"predecessor-version":[{"id":14535,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/14534\/revisions\/14535"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21003"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=14534"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=14534"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=14534"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=14534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}