{"id":9393,"date":"2026-11-17T22:15:57","date_gmt":"2026-11-17T19:15:57","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=9393"},"modified":"2026-11-18T20:57:18","modified_gmt":"2026-11-18T17:57:18","slug":"apc-e3mups120khs-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3mups120khs-three-phase-ups\/","title":{"rendered":"APC E3MUPS120KHS Three-Phase UPS, 120 kVA \/ 120 kW"},"content":{"rendered":"<p>For a critical load that is already near the top of what the E3MUPS100KHS at 100 kVA \/ 100 kW can carry, or one expected to grow during the life of the installation, the APC E3MUPS120KHS adds headroom with a rating of 120 kVA \/ 120 kW. That extra margin is its defining trait in the family: it lets a project absorb new server racks, an additional security system or another floor of tenants without reopening the UPS decision. The kVA and kW figures match, so 120 kW is available as real power for the protected board. The unit works at 400 V in a 3:3 configuration, with three-phase input and three-phase output. Runtime is set by the external battery system it is paired with, and batteries are not included, which keeps the choice of autonomy tied to each site&#8217;s generator strategy.<\/p>\n<h2>Saudi projects that call for an APC E3MUPS120KHS<\/h2>\n<p>Large projects in the Kingdom are usually delivered in phases, and the electrical design has to protect the critical load of the first phase while leaving room for the next. A 120 kW frame fits that pattern in several sectors. In new mixed-use developments and business districts, the main IT and security room grows as tenants move in, and the UPS chosen at handover has to keep pace. In healthcare, hospital expansions add clinics, imaging departments and the network equipment behind them, all of which ends up on the protected board. Universities and research centres add laboratories and computing resources year after year. Airports, sea ports and transport operators run operational systems, passenger information displays and surveillance from central equipment rooms whose load creeps upward with every system update. Banks and insurers running regional processing centres in Riyadh, Jeddah or the Eastern Province need the same headroom for their core systems.<\/p>\n<h2>Sizing the E3MUPS120KHS against real demand<\/h2>\n<h3>Start from the measured load<\/h3>\n<p>A load survey at the critical board gives the starting figure in kilowatts. Because this model is rated at 120 kW, the gap between that figure and the rating is your growth reserve. If today&#8217;s load and the approved expansion fit inside that reserve with a safety margin, the E3MUPS120KHS is a sound choice.<\/p>\n<h3>Compare it with the neighbouring frames<\/h3>\n<p>If the measured load plus growth sits comfortably within the E3MUPS100KHS rating of 100 kVA \/ 100 kW, the smaller frame saves budget. If the plan points well beyond 120 kW, the E3MUPS200KHS at 200 kVA \/ 200 kW is the largest frame in the family and avoids a replacement within a few years. The E3MUPS80KHS at 80 kVA \/ 80 kW and the E3MUPS60KHS, E3MUPS60KHBS and E3MUPS60KHB2S at 60 kVA serve smaller boards, and the E3SUPS models cover lighter three-phase loads again.<\/p>\n<h2>APC E3MUPS120KHS deployment notes<\/h2>\n<p>Before delivery, confirm with the electrical contractor that the incoming feed is a 400 V three-phase supply and that the protected board downstream is three-phase too, then size breakers and cables for a 120 kVA unit with an eye on the future load the extra headroom is meant to absorb. Specify the external battery system at the same time as the UPS: its runtime should cover the time your generator needs to start and take the load, and its cabinet location and cable route belong on the same drawing. The box contains a dust filter and an installation guide. Install the filter from the first day of operation, because equipment rooms in Saudi buildings collect dust even when closed, and clean it on a fixed schedule. Work through the installation guide in order during commissioning, and keep a load record so that each new phase of the project is checked against the 120 kW rating before it is connected.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 120 kVA \/ 120 kW APC three-phase UPS that gives a growing critical board room to expand, running at 400 V in a 3:3 configuration from an external battery system.<\/p>\n","protected":false},"featured_media":21375,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[706,845],"product_tag":[],"class_list":["post-9393","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-ups-backup-power","product_cat-three-phase-ups","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=9393"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9393\/revisions"}],"predecessor-version":[{"id":9394,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9393\/revisions\/9394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21375"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=9393"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=9393"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=9393"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=9393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}