{"id":9405,"date":"2026-11-17T22:15:55","date_gmt":"2026-11-17T19:15:55","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=9405"},"modified":"2026-11-18T20:57:19","modified_gmt":"2026-11-18T17:57:19","slug":"apc-e3mups60khb2s-three-phase-ups","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-e3mups60khb2s-three-phase-ups\/","title":{"rendered":"APC E3MUPS60KHB2S 60 kVA Three-Phase UPS with Batteries"},"content":{"rendered":"<p>The APC E3MUPS60KHB2S is a 60 kVA \/ 60 kW three-phase UPS that arrives with its battery bank as part of the same order, and that is what sets it apart among the 60 kVA models in the family. Where the E3MUPS60KHBS and E3MUPS60KHS leave the batteries to a separate purchase, this unit ships with 4 strings of 9Ah VRLA batteries at a 240 V battery voltage, so one order covers both the power module and the stored energy behind it. The unit supports up to 6 battery strings, which leaves room to extend runtime later without replacing the UPS. Input is 400 V in a 3:3 configuration, three-phase in and three-phase out, and the apparent and real power ratings match, so the full 60 kW is available to the protected load. For buyers who want a complete package at this rating rather than a frame-only purchase, this is the model to price first.<\/p>\n<h2>What the APC E3MUPS60KHB2S does on site<\/h2>\n<p>The UPS sits between the incoming three-phase supply and the critical distribution board. While mains or the standby generator is healthy, power reaches the load through the UPS; when the supply drops, the VRLA battery strings carry the board until mains returns or the generator starts and stabilises. Because the batteries come with the unit, commissioning does not wait on a second supplier or a separate battery order, and the backup time the site has on day one is set by the strings supplied.<\/p>\n<p>Runtime depends on the actual load, not on the nameplate. A board drawing well below 60 kW will hold longer on the same strings than one running close to the rating, so the practical first step is to measure the real critical load and compare it with the backup time operations needs. If the supplied strings fall short, the answer is to add strings up to the maximum of 6 rather than move to a larger UPS, as long as the load itself stays within 60 kW.<\/p>\n<p>The matching 60 kVA \/ 60 kW ratings also simplify sizing for the site engineer: the kilowatt figure read at the distribution board can be compared directly with the nameplate, with no power-factor reduction to subtract, leaving a margin for growth and for loads that draw higher current at start-up.<\/p>\n<h2>Where it fits in Saudi facilities<\/h2>\n<p>A 60 kW three-phase rating matches the critical loads of a mid-sized server room, a building management and security control room, or the control panels of a production line. In a Riyadh or Jeddah office tower it can carry the core network, the CCTV recording servers and the access control head-end on one protected board. In hospitals and clinics it serves departmental IT and monitoring systems that must ride through the transfer to generator. On industrial sites in Jubail or Yanbu it protects PLC panels and SCADA servers from the short interruptions that otherwise force a controlled restart of the line. Schools, universities and government buildings with a central IT room are also a natural fit, particularly where procurement prefers a single line item that covers the UPS and its batteries together.<\/p>\n<h2>Choosing between the 60 kVA models and the rest of the family<\/h2>\n<p>Three models share the 60 kVA \/ 60 kW rating, and the E3MUPS60KHB2S is the only one of them that ships with batteries. The E3MUPS60KHBS is designed for 240 V VRLA batteries but comes without them, which suits a buyer who already has an approved battery supplier or wants to buy the batteries under a separate contract. The E3MUPS60KHS works with an external battery system with batteries sold separately, which suits sites planning a dedicated battery cabinet sized for longer runtime.<\/p>\n<p>If the measured load is approaching the 60 kW ceiling, look one step up: the E3MUPS80KHS is rated at 80 kVA \/ 80 kW and the E3MUPS100KHS at 100 kVA \/ 100 kW. If the load is clearly lower, the E3SUPS40KHB at 40 kW\/40 kVA and the E3SUPS30KHB at 30 kW \/ 30 kVA cover smaller rooms without paying for capacity that will sit unused.<\/p>\n<h2>Deployment notes<\/h2>\n<p>Prepare a 400 V three-phase feed and a three-phase output to the protected board, as the 3:3 configuration requires. Because the unit carries VRLA batteries, place it in an air-conditioned room where temperature can be controlled; this battery type loses service life quickly in heat, which matters in plant rooms that are not cooled through the summer.<\/p>\n<p>The package includes a dust filter, worth fitting and checking on a schedule in dusty locations, and an installation guide for the electrician to follow on cabling and the first start sequence. When adding battery strings later, match the 240 V battery voltage and the 9Ah VRLA batteries of the strings already fitted, up to the 6-string limit.<\/p>\n<h2>Package Contents<\/h2>\n<ul>\n<li>Dust filter<\/li>\n<li>Installation guide<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A 60 kVA \/ 60 kW three-phase UPS from APC that ships with 4 strings of 9Ah VRLA batteries at 240 V, expandable to 6 strings, for 400 V 3:3 installations.<\/p>\n","protected":false},"featured_media":21369,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[845,706],"product_tag":[],"class_list":["post-9405","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-three-phase-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=9405"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9405\/revisions"}],"predecessor-version":[{"id":9406,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9405\/revisions\/9406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21369"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=9405"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=9405"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=9405"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=9405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}