{"id":9860,"date":"2026-11-17T22:08:45","date_gmt":"2026-11-17T19:08:45","guid":{"rendered":"https:\/\/risys.sa\/?post_type=product&#038;p=9860"},"modified":"2026-11-18T20:56:48","modified_gmt":"2026-11-18T17:56:48","slug":"apc-srv3krilrk-uninterruptible-power-supply","status":"publish","type":"product","link":"https:\/\/risys.sa\/en\/product\/apc-srv3krilrk-uninterruptible-power-supply\/","title":{"rendered":"APC SRV3KRILRK Rackmount UPS with Extended Runtime"},"content":{"rendered":"<p>APC SRV3KRILRK places extended-runtime backup power in a 4U rackmount installation for equipment teams planning around a defined cabinet layout. Its 3 kVA and 2400 W ratings set the electrical boundaries, while the 230 V output and IEC outlets determine the connection review. This makes the unit relevant to projects that need to address operating continuity and physical installation together. Before approving the purchase, identify the equipment receiving backup power, decide what the site needs to do during a supply interruption and allocate space inside the rack. Keep the complete model reference on the project schedule so that procurement, installation staff and operations are working toward the same equipment selection.<\/p>\n<h2>APC SRV3KRILRK in the cabinet plan<\/h2>\n<p>The Rackmount 4U format should be reflected in the equipment elevation before installation begins. In an occupied cabinet, review where the UPS will sit alongside existing equipment and how personnel will reach the power connections. Allocate cable routes at the same time as the rack position. This avoids leaving the person installing the unit to decide where the protected equipment should be connected.<\/p>\n<p>An LCD provides a local display on the UPS. Position the equipment so that site personnel can reach its front during operation and planned maintenance. Local access is particularly relevant when the cabinet belongs to a branch office or an operations room where facilities staff need an identifiable point for checking the installed unit.<\/p>\n<h2>Load limits and outlet matching<\/h2>\n<p>Plan the connected equipment against both 3 kVA and 2400 W. The apparent power rating and the real power rating describe different limits, so the equipment schedule should support review of both. Check the 230 V output against the power requirements of the intended devices before approving the connection plan. Keep a record of equipment assigned to the 230 V output so that later additions can be reviewed against the original load calculation.<\/p>\n<p>The available output connections are six IEC C13 outlets and one IEC C19 outlet. Map each device to a suitable connection and include the necessary equipment leads in the installation plan. Socket allocation should follow the approved load list within the 2400 W limit; it should not become a reason to add equipment simply because an outlet remains free. Labelling the destinations also helps maintenance personnel keep the intended arrangement after equipment is moved.<\/p>\n<h2>Extended runtime for operational priorities<\/h2>\n<p>Extended runtime is part of this model&#8217;s design. Use it as a reason to define the site&#8217;s continuity objective clearly: which equipment has priority, what staff should do after an interruption and when an orderly shutdown becomes appropriate. Assess the operating period needed for the actual load. A capacity rating alone is not a schedule for how long a particular set of equipment should remain operating.<\/p>\n<p>For a Saudi facilities or security manager, possible project contexts include an office equipment cabinet, a branch communications room or a rack serving operational systems. Selection still depends on electrical fit with the 230 V output and the agreed backup-power scope. Assign an owner to that scope so that changes to the cabinet receive the same review as the original installation.<\/p>\n<h2>Ordering and handover<\/h2>\n<p>Consider SRV3KRILRK alongside SRV3KRI and SRV3KRIL as separate model references within the family. Retain this unit&#8217;s extended-runtime requirement and 4U installation format when reviewing a proposed substitution. At completion, hand over the cabinet layout, connected equipment schedule for the 2400 W output and cable identification together. These practical records let the operations team maintain the intended load arrangement as the site changes.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An extended-runtime rackmount UPS rated 3 kVA \/ 2400 W, with 230 V output. Plan a 4U rack position and allocate its IEC connections to the equipment requiring backup.<\/p>\n","protected":false},"featured_media":21254,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[716],"product_cat":[843,706],"product_tag":[],"class_list":["post-9860","product","type-product","status-publish","has-post-thumbnail","product_brand-apc","product_cat-online-ups","product_cat-ups-backup-power","first","onbackorder","sale","taxable","shipping-taxable","purchasable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/comments?post=9860"}],"version-history":[{"count":1,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9860\/revisions"}],"predecessor-version":[{"id":9861,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product\/9860\/revisions\/9861"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media\/21254"}],"wp:attachment":[{"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/media?parent=9860"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_brand?post=9860"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_cat?post=9860"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/risys.sa\/en\/wp-json\/wp\/v2\/product_tag?post=9860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}