APC E3MUPS200KHS Three-Phase UPS, 200 kVA / 200 kW
The largest APC three-phase UPS in its family at 200 kVA / 200 kW, built for the main critical bus of large facilities and running at 400 V 3:3 from an external battery system.
Original price was: 86,090.65 SAR.80,925.21 SARCurrent price is: 80,925.21 SAR. excl. VAT
Available on backorder
RISYS can programme and prepare devices before delivery. Contact us for quantity and project details.
Wholesale and project supply — up to 45% off











Up to 45% off wholesale supply.
Overview
The APC E3MUPS200KHS is the largest frame in its three-phase family, rated 200 kVA / 200 kW. It is aimed at the main critical bus of a large facility, where a data hall, a control centre or a whole building’s protected services are fed from one point rather than from a collection of departmental UPS units. With identical kVA and kW ratings, the full 200 kW can be counted as real power when the load schedule is drawn up. The unit operates at 400 V in a 3:3 configuration, taking a three-phase supply and delivering a three-phase output to the protected switchboard. Backup time comes from an external battery system that is specified separately, as batteries are not included; at this scale the battery plant is a design element in its own right, sized to bridge the transfer to standby generation.
Where the APC E3MUPS200KHS sits in the range
The step below it is the E3MUPS120KHS at 120 kVA / 120 kW, which remains the better fit while the protected load and its planned growth stay comfortably inside that rating. The family has no intermediate frame between the two, so the E3MUPS200KHS becomes the choice once a load survey or an approved expansion pushes demand beyond what the E3MUPS120KHS can carry with a safe margin. Further down, the E3MUPS100KHS at 100 kVA / 100 kW, the E3MUPS80KHS at 80 kVA / 80 kW and the E3MUPS60KHS, E3MUPS60KHBS and E3MUPS60KHB2S at 60 kVA serve mid-sized and departmental rooms, while the E3SUPS range covers smaller three-phase loads. Choosing a 200 kVA frame is essentially a consolidation decision: one large protected bus, one battery plant and one maintenance contract instead of several.
Operating a 200 kW protected bus
On a large site, the UPS output usually feeds a main protected switchboard that in turn supplies sub-distribution boards across several rooms or floors. That makes load balance across the three phases a real operational concern: the facilities team should measure each phase and place new equipment so that no single phase runs far ahead of the other two. When the utility supply fails, the external battery system carries the whole bus until the standby generator is running and stable. Because everything critical depends on this one unit, maintenance windows need careful planning with the IT and security teams, and the protected load record should be kept current so the reserve between today’s demand and the 200 kW rating is always known.
Saudi facilities sized for this frame
Government data centres and shared-services centres in Riyadh, where several agencies run their systems from one hall, have critical loads in this range. Large hospitals and medical cities depend on a protected bus carrying electronic records, imaging archives, laboratory systems and the network backbone of the whole campus. Petrochemical and industrial plants in Jubail and Yanbu run central control buildings housing DCS, SCADA and safety-related servers that must not face a power loss unprotected. Airports and metro and rail operators concentrate operational IT, passenger information and surveillance recording in equipment rooms that serve entire terminals or lines. Giga-project sites and new cities in the north-west, where infrastructure is commissioned in large blocks, need a frame big enough for a district-level operations centre. Stadiums and exhibition venues hosting major events need their security and broadcast control rooms on protected power for the full duration of each event.
Installation and commissioning
Electrical and space planning
Treat the E3MUPS200KHS as a central plant item. The feed must be a 400 V three-phase supply and the protected output is three-phase as well, so the electrical designer should engineer the upstream protection, feeder cables and output switchboard for a 200 kVA unit. The external battery system brings its own footprint, weight and cabling, so fix the plant room layout with both in mind before the room is fitted out.
Dust filter and handover
A dust filter and an installation guide ship with the unit. Fit the filter before the UPS is first energised, since fine dust is a constant in Saudi plant rooms, and clean it at set intervals. Follow the guide’s sequence during installation, and at handover record the protected load on each phase so every later addition can be checked against the 200 kW rating.
Package Contents
- Dust filter
- Installation guide
Technical Specifications
- Brand
- APC
- Battery Details
- external battery system
- Model
- E3MUPS200KHS
- Power
- 200 kVA / 200 kW
Frequently Asked Questions
What is the rating of the APC E3MUPS200KHS?
It is rated 200 kVA / 200 kW, the largest frame in its family, and the full 200 kW counts as real power for the protected bus.
When is the E3MUPS120KHS enough instead?
The E3MUPS120KHS at 120 kVA / 120 kW is enough while the protected load and its planned growth stay inside its rating with a safe margin; anything beyond that points to the E3MUPS200KHS.
Does it come with batteries?
No. It works with an external battery system that is selected and ordered separately, sized to the load and the time needed for the generator to take over.
What voltage and phase configuration does it use?
400 V in a 3:3 configuration, meaning three-phase input and three-phase output.
What ships with the unit?
A dust filter and an installation guide.

APC UPS systems keep servers and network cabinets running through outages and unstable mains, and the wider APC range extends into the racks, power distribution and sensors around them. APC began in the United States as American Power Conversion and
Browse brand productsDelivery across Saudi Arabia
Clear warranty
Some devices or frequencies may require a permit or approval depending on the intended use and the regulations in force in the Kingdom. Requirements are clarified before project orders are fulfilled.
Customer Reviews
No ratings yet for this product
Only logged in customers who have purchased this product may leave a review.
Related Products
APC SMTL750RMI2UC Lithium-ion Smart-UPS 600W 2U Rack
On backorder
APC SRV6KI On-Line Tower UPS 6 kVA
On backorder
APC SRV10KRIL Online UPS Extended Runtime
On backorder
APC SRV6KIL Tower UPS 6 kVA External Battery
On backorder







Reviews
There are no reviews yet.