APC PDM3516IEC-800 Power Distribution Module
An 800 cm output cable gives this power distribution module its route-planning role. The electrical arrangement includes a 16 A IEC 309 outlet, circuit monitoring and a three-pole breaker.
Original price was: 2,965.47 SAR.2,787.54 SARCurrent price is: 2,787.54 SAR. excl. VAT
Available on backorder
RISYS can programme and prepare devices before delivery. Contact us for quantity and project details.
Wholesale and project supply — up to 45% off











Up to 45% off wholesale supply.
Overview
APC PDM3516IEC-800 addresses a distribution layout where the cable must follow an 800 cm route allowance between the module and its destination. The output cable length is the main physical selection point: it lets the project team assess the proposed path before committing to a particular variant. For a buyer coordinating electrical works across an equipment area, the useful question is whether that reach fits the installed route, including its turns and final connection. The module pairs this cable arrangement with an IEC 309 outlet, circuit monitoring and a three-pole breaker. Assess those electrical features alongside the route so that procurement, installation and operations are working toward the same connection plan.
Routing the APC PDM3516IEC-800 output
With an output cable measuring 800 cm, this model calls for a deliberate routing decision rather than a simple check of room dimensions. Trace the intended path around equipment, through the planned cable route and up to the receiving connection. Establish where the cable will be supported and how access will be maintained before equipment positions become fixed. This is particularly useful when electrical work and equipment installation have separate contractors: the cable variant can be agreed against a common route instead of each team assuming a different connection point.
Define the electrical connection
The input rating is 400 V three-phase at 50 Hz. Both maximum line current and maximum current draw are 16 A. The receiving connection must be assessed against the single IEC 309 16 A outlet. Together, these details provide a practical basis for an installer to compare the module with the planned supply and load. Resolve connector matching during the purchasing review, when it can still influence the equipment schedule. The length of the output cable should be treated as a routing allowance within that electrical design, rather than a reason to increase the intended load.
Plan the circuit around its equipment
One three-pole circuit breaker and circuit monitoring form part of the module’s circuit arrangement. When assigning the module to a distribution position, identify the equipment it is intended to serve and record that relationship in the site’s electrical documentation. This gives the operations team a clear circuit reference during service planning. Include the monitoring feature in the handover discussion so that staff responsible for the connected equipment understand how the circuit fits into the wider operating arrangement. The equipment allocation, breaker reference and cable destination should remain consistent across the project documents.
A project choice for Saudi operations teams
Consider this variant during electrical planning for Saudi offices, warehouse equipment areas or service facilities where a distribution connection must reach a defined destination. In an existing building, measure around the equipment and services already in place. In a fit-out, agree the cable route before furniture, cabinets or other equipment make access more difficult. These are useful procurement checks because the module is selected for a real connection path. A planned route also helps the facilities team explain the selection to the installer and confirm that the delivered model corresponds to the intended position.
Keep the family reference precise
Compare PDM3516IEC-800 with PDM3516IEC-380 and PDM3516IEC-860 at the point of variant selection, then carry the chosen reference through the order. For PDM3516IEC-800, use its 800 cm output cable as the physical criterion against the measured route. A family name alone is insufficient to communicate that choice to purchasing or delivery teams. If the design changes after quotation, review the variant again before approving a substitution. This approach keeps cable planning connected to the actual model being supplied and gives everyone a clear reference when equipment arrives.
Commissioning preparation and ownership
The module has a grey finish and a 12-month warranty. Consult the installation guide when arranging the work and keep it accessible to the team maintaining the distribution installation. At handover, identify the final cable path and receiving connection on the project documentation. Confirm that the intended load and supply checks have been completed by the responsible electrical team. Retaining the exact model in the equipment register helps future staff distinguish this routed connection from other distribution positions when the facility is altered or additional equipment is introduced.
Package Contents
- Power distribution module
- Installation guide
Technical Specifications
- Brand
- APC
- Warranty
- 1 Year
- Model
- PDM3516IEC-800
Frequently Asked Questions
What distinguishes this cable variant?
PDM3516IEC-800 has an output cable length of 800 cm; choose it against the measured installation route.
Which outlet does the module provide?
The module has one IEC 309 16 A outlet.
Does the circuit arrangement include a breaker and monitoring?
It includes one three-pole circuit breaker and circuit monitoring.
What are the input voltage and frequency?
The input is rated at 400 V three-phase and 50 Hz, with a maximum line current of 16 A.

APC UPS systems keep servers and network cabinets running through outages and unstable mains, and the wider APC range extends into the racks, power distribution and sensors around them. APC began in the United States as American Power Conversion and
Browse brand productsDelivery across Saudi Arabia
Clear warranty
Some devices or frequencies may require a permit or approval depending on the intended use and the regulations in force in the Kingdom. Requirements are clarified before project orders are fulfilled.
Customer Reviews
No ratings yet for this product
Only logged in customers who have purchased this product may leave a review.
Related Products
APC AP4421A Rack Automatic Transfer Switch 1U 10A
On backorder
APC APDU9959EU3 Switched Rack PDU, 16A 230V, IEC309 Cord
On backorder
APC AP6032A Rack PDU, 4 C19 Outlets, 32A IEC 60309 Input
On backorder
APC AP4424A Rack Transfer Switch 2U 32A, 18 Outlets
On backorder





Reviews
There are no reviews yet.