Wholesale & retail - B2B/B2C
Free site survey in Riyadh
Shipping across the Kingdom
Warranty on all products
BrandAPC

APC EPDU1216M Three-Phase Metered Rack PDU

Metered rack distribution rated at 11000 VA, with 400 V three-phase input and 230 V output. Includes real-time remote monitoring, 21 C13 outlets and 3 C19 outlets.

ModelEPDU1216MMountingRACK-MOUNTEDPower11000 VA

Original price was: 3,450.55 SAR.Current price is: 3,243.52 SAR. excl. VAT

Available on backorder

WhatsApp Inquiry

RISYS can programme and prepare devices before delivery. Contact us for quantity and project details.

Wholesale and project supply — up to 45% off

Minimum order5 units

Shipping and delivery icon
Fast shipping
SMSA Express logoFedEx logoNAQEL Express logoDHL logo
Product warranty icon
Genuine warranty
All products carry a one-year authorised-agent warranty.
Secure payment icon
Secure payment
madaVisaMastercardApple Pay
B2B sales icon
B2B/B2C supply

Up to 45% off wholesale supply.

Overview

APC EPDU1216M is the metered rack PDU to assess when a cabinet project calls for 11000 VA capacity and a three-phase supply arrangement. It takes 400 V three-phase input and provides a specified 230 V output, placing electrical infrastructure at the centre of the buying decision. The unit also supports real-time remote monitoring, so facilities and IT teams can plan distribution and operational oversight together. Within this family, its electrical configuration distinguishes it from the single-phase alternatives. For a Saudi server room or central equipment cabinet, confirm the supply architecture first, then review the outlet allocation, side mounting space and management approach against the devices that will actually be connected.

APC EPDU1216M and three-phase supply planning

The input current limit and maximum current draw are 16 A, with a frequency of 50/60 Hz. The input connection is IEC 60309 16 A 3P + N + PE. Give this connector designation to the electrical team when planning the cabinet feed so that the supply arrangement is assessed as a whole. The 11000 VA load capacity should be considered alongside the equipment schedule and the site’s electrical design. Decide how the planned loads will be allocated across the supply during that review, before installation work fixes the cabinet’s final connection arrangement.

Allocate the mixed outlet layout

The output side has 21 IEC 60320 C13 outlets and 3 IEC 60320 C19 outlets. This mix calls for an equipment connection plan based on actual lead types. Identify the devices requiring each connector, assign their intended positions and document the resulting outlet map. Capacity planning must accompany that physical allocation: a matching lead is only part of a suitable connection. When the cabinet population changes, review both the device demand and its assigned connection so the electrical plan remains aligned with the equipment in service.

Build monitoring into the operating workflow

Web, SNMP and Command Line Interface management are available, together with real-time remote monitoring. A team using browser-based administration can consider the Web interface, while an established monitoring environment can assess SNMP integration. The command interface offers a further management route for administrators whose procedures use it. Assign ownership of the PDU’s monitoring during commissioning and include its management arrangements in the site handover. This is particularly relevant where electrical maintenance and IT administration belong to different teams that need a common understanding of the cabinet.

Check vertical mounting and cable reach

The rack-mounted unit uses a vertical side position in a 0U format. Its height is 1175 mm, width is 62 mm and depth is 44.4 mm, with a net weight of 2.74 kg. Check the cabinet side area against those measurements, including access to the outlets after all equipment leads are fitted. The supply cable is 1.98 m long. Plan its route to the designated feed rather than assuming the feed can be reached from any mounting position. The mounting location and supply location therefore need to be settled together during cabinet layout work.

Where this family member belongs

In a central office server room, EPDU1216M warrants consideration where the electrical design already calls for three-phase distribution and remote oversight. The same assessment can apply to a logistics site’s main equipment room or a security operations cabinet when its load and supply requirements match. EPDU1132M is the single-phase metered member to compare for a different feed arrangement; EPDU1132B serves a basic distribution requirement. The relevant distinction is the combination of supply architecture, capacity and operating method. Use those criteria to narrow the shortlist before comparing cabinet dimensions or purchasing quantities.

Prepare the environment and maintenance record

Operating temperature is -5 to 45 °C, and operating relative humidity is 5 to 95%. Assess conditions where the PDU will sit within the rack, including the effect of nearby equipment airflow. Storage temperature is -20 to 65 °C, which matters when units wait in project storage before commissioning. The warranty term is 12 months. Keep the supply designation, outlet allocation and management responsibility with the installation records. Review these details when adding equipment, moving the rack or changing the monitoring workflow, so later work starts with the actual electrical and operational arrangement.

Package Contents

  • Installation guide
  • User manual
  • Toolless mounting kit
  • Vertical mounting brackets

Technical Specifications

Brand
APC
Warranty
1 Year
Model
EPDU1216M
Mounting
RACK-MOUNTED
Power
11000 VA

Frequently Asked Questions

What supply does this model require?

It uses 400 V three-phase input with an IEC 60309 16 A 3P + N + PE connection.

What are its capacity and output voltage?

Load capacity is 11000 VA and the specified output voltage is 230 V.

How many outlets are fitted?

The unit has 21 IEC 60320 C13 outlets and 3 IEC 60320 C19 outlets.

Does it offer remote management?

It supports real-time remote monitoring and management through Web, SNMP and Command Line Interface.

Brand
APC

APC UPS systems keep servers and network cabinets running through outages and unstable mains, and the wider APC range extends into the racks, power distribution and sensors around them. APC began in the United States as American Power Conversion and

Browse brand products
Shipping, Warranty and Regulatory

Delivery across Saudi Arabia

Clear warranty

Some devices or frequencies may require a permit or approval depending on the intended use and the regulations in force in the Kingdom. Requirements are clarified before project orders are fulfilled.

Customer Reviews

No ratings yet for this product

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Related Products

APC

APC APDU9953 Switched Rack PDU, 32A 230V, 21 C13 + 3 C19

Model APDU9953
ZeroU24
Original price was: 6,100.98 SAR.Current price is: 5,734.92 SAR. excl. VAT Save 366.06 SAR

On backorder

Request a Quote
APC

APC APDU9959NA3 Switched Rack PDU, 20A 208V, L620 Cord

Model APDU9959NA3
0U24208V
Original price was: 6,000.96 SAR.Current price is: 5,640.90 SAR. excl. VAT Save 360.06 SAR

On backorder

Request a Quote
APC

APC AP8886 Metered Rack PDU, 32A Three-Phase 400V

Model AP8886
2 YearsRack-mounted32 A
Original price was: 9,311.73 SAR.Current price is: 8,753.03 SAR. excl. VAT Save 558.70 SAR

On backorder

Request a Quote
APC

APC AP7922B Switched Rack PDU, 32 A, 2U, 16 C13 Outlets

Model AP7922B
2UEthernet network port
Original price was: 5,550.89 SAR.Current price is: 5,217.84 SAR. excl. VAT Save 333.05 SAR

On backorder

Request a Quote

Original price was: 3,450.55 SAR.Current price is: 3,243.52 SAR. excl. VAT